Civil & Environmental Engineering
Muscatine Regional Water Detention Plan
As part of the Senior Design Capstone Course in the Department of Civil and Environmental Engineering, the students completed a regional hydrologic and hydraulic analysis of the watershed north of the City of Muscatine.
Recreational Trail System
To address the lack of trails and poor connectivity in Muscatine, IA, students in the School of Urban and Regional Planning at the University of Iowa prepared a connectivity study, which included recommendations on trail improvements and expansions.
Washington Iowa Wellness Park
As part of the Senior Design Capstone Course in the Department of Civil and Environmental Engineering, the students had the opportunity to complete the engineering plans for locating and constructing ball fields, new trails, parking facilities, and ancillary structures for the city of Washington.
Stormwater Management with Permeable Pavement and Bioretention Structures
Engineering students researched the extent of impermeable surfaces in the east-west portion of North Dodge Street Court and developed a stormwater management plan for the city of Iowa City.
Iowa City was interested in the increased application of permeable pavement and bioretention within the city. These systems fell under the umbrella of “green street” designs, which address growing concern for sustainable stormwater management by mimicking local hydrology prior to development.
South Airport Site Development Improvements
Engineering students created a Master Redevelopment Plan that presented findings on the condition of Iowa City's airport facilities and made recommendations on how to most efficiently develop the farmland around the decommissioned southern runway to increase the airport’s future revenue generation capacity.
Water Reclamation for Terry Trueblood Recreation Area
Engineering students created a project aimed at reducing the water demand, energy consumption and costs for Iowa City's Wastewater Division. The students calculated the areas needing irrigation along with the volume of water needed. Pump sizes, electrical service, and a design plan estimating construction and operational costs were the deliverables.